Компания ARTS, Атырау

ARTS:Преимущества использования азота при пайке труб

ARTS:Преимущества использования азота при пайке труб В статье компании ARTS рассмотрим роль азота в достижении идеальных паяных соединений труб Пайка труб азотом является эффективным способом соединения медных труб.

Installation of ventilation and air conditioning system for Head Office of Sberbank in Atyrau

ARTS renders the services not only to its clients involved in gas and oil production but also the banking sector. Our engineers have installed ventilation and air conditioning system for SB Sberbank JSC in Atyrau, located at the following address: Kulmanov Street, 119 A. The following works have been performed as the part of the service: Installation of air handling units and commissioning Installation and commissioning of heating unit and cooling circuit for ventilation units Treatment and installation of self-adhesive foil insulation for air ducts with total area of more than 300m2 ARTS provides the warranty for its equipment and the works performed upon the completion. The warranty period varies from 1 to 5 years and depends on installed equipment. Such approach allows the client to be confident in reliability and high quality of services provided by ARTS LLP.

Maintenance of heating, ventilation, and air conditioning systems for Karabatan Utility Solutions LLP

ARTS completed its annual maintenance of heating, ventilation, and air conditioning (HVAC) systems at the gas turbine power plant, Karabatan site. The following types of equipment were serviced as part of the service: Water cooled chillers Duct fans, radial flow fans, smoke exhaust афты, axial roof fans, reversible fans Fan heaters Hydromodules Split systems HVAC control panels Electric heaters Maintenance of heating, ventilation and air conditioning systems (HVAC) for such units requires expert technical knowledge and problem-solving skills. ARTS is happy to provide its best work packages to maintain your HVAC systems in an efficient and reliable mode. Our experts are ready to troubleshoot and fix any failures within the shortest time periods. You may get consultation on our web site by contacting our specialists in a very convenient way for you.

ARTS LLP wins in the National Competition “Qazaqstan Project Management Awards 2021”

Project Improvement Forum was held at the Academy of State Administration under the President of the Republic of Kazakhstan from December 3 to December 4. Outcomes of the II National Competition “Qazaqstan Project Management Awards 2021” were announced at the Forum. What Project Improvement Forum is conducted for? The professional competitive platform is organized in order to develop project management system within Kazakhstan and to support authorities and state institutions which keep up with the times and introduce project management techniques and tools in their activities. The competition brings together project managers from all over Kazakhstan to work together and exchange experiences for the second year in a row. It allows identification of the best project managers who are able to implement projects and programs in efficient way. Nominations and participants of Qazaqstan Project Management Awards State institutions, representatives of business, non-governmental organizations of quasi-public sector, and higher educational institutions competed for the title to be the best for the first time this year. Our company was awarded “Best Project of the Year” nomination in “Business” category. We have been designing, supplying and installing heating, ventilation and air conditioning systems since 2000. We transformed our small-scale HVAC company to an industry leader in our region since then. The award in the competition is an important event for our company and it proves that development strategy we chose is effective. We presented a project on improvement of organization called “Building of System Business” for the competition. Its purpose is to help top managers take a fresh look at activities of team and company as a whole. We suggested techniques to improve workflow by introducing process transparency mechanisms and increasing KPI of employees. Comments of the Director, ARTS LLP Director of the company, Svetlana Olneva said, “In 2019, our company experienced a sharp growth rate, which, together with rapid scaling, caused a number of problems. We further realized that the lack of consistency within the company could negatively affect our work, and therefore we needed to switch from manual management to system management. This problem became a prerequisite for development of the project that has been implemented for year and a half. As a result, the project allowed achieving uninterrupted, stable, structured and regulated operation of the company. We have created of a structure with clearly defined roles, functions, areas of authority and responsibilities. We are pleased that the project has received such a high award and we hope that our experience will be useful for other companies as well”. How Qazaqstan Project Management Awards is conducted The competition was traditionally held in several stages that included acceptance of online applications, evaluation of reports of participants by professional assessors, reviewing and award of winners by the jury that was formed out of representatives of government agencies and professional design communities. The number of participants has increased this year. More than 300 applications were submitted. It tells us about increased interest in the Competition.

Cold fog antiviral treatment

ARTS have been providing antiviral treatment to NCOC for one year. We provided our services to the following: Riverside, BC Frontier Plaza, Chagala Center, Chagala Medical Center, Data Center, Atyrau Training Center. The following scope of works has been completed: 1. Total area of ​​​​treated indoor premises was more than 1.6 million square meters in 2021 2. Total number of treated air ducts was more than 80,000 meters in 2021 3. Number of treated fan coil units was more than 10,000 in 2021 4. We disinfected more than 100 vehicles in 2021. We used cold fog with Belodez for treatment of all our objects. This treatment method is implemented for professional disinfection of houses, offices, warehouses, enterprises and public spaces. The advantages of the cold fog are that it is safe for people, animals and the environment. It is capable of penetrating into hard-to-reach areas and there is no pronounced chemical smell after treatment. You may order cleaning and disinfection of ventilation systems for your premises by filling out a service request form on our web site.

Inspection of refrigeration supply systems at TCO facilities

Within the framework of the project “Inspection of refrigeration supply systems at CTL-1, CTL-2”, specialists of ARTS LLP conducted inspection of ventilation system and air conditioning systems at infrastructure objects of Complex Technological Lines, Tengiz plant. The purpose of the inspection was to determine the possibility of replacing obsolete refrigeration supply systems that ran on R22 freon with similar ones which are ozone-friendly (implementation of the decisions of the Montreal Protocol as of 1987). Since the object was active, we had to take into account the following special conditions: develop solutions that would allow replacing refrigeration part only without any full scale intervention into the main ventilation system ensure minimum losses for stoppage during dismantling and installation works As part of the project, additional adjustments were made to the refrigerating capacity of the systems where climate changes (increased average air temperature) were also considered. Professional approach of the engineers from ARTS LLP allowed developing solutions that helped the Customer to implement the replacement project in an efficient way. It resulted in saving of time and money.

Aerodynamic tests of ventilation systems for TCO CO

Specialists of ARTS have performed aerodynamic tests of ventilation systems for TCO’s Chief Office. Parameters of 33 ventilation branches from central shafts were measured floor by floor in the course of the works. The total number of test points was 2,230. Aerodynamic tests of ventilation systems included operational checks of air conditioning systems, ventilation systems, smoke protection and air heating systems. The following main parameters were checked: amount of air consumed by the system; air change rate; performance indicators of ventilation system. The following were checked in the course of tests: whether actual operational features of ventilation systems are in line with declared design values operation of ventilation system together with process equipment (the specialists regulate aerodynamic flows within the system at the same time) whether there are any installation defects in certain parts of ventilation system (loose fitting components, poorly fixed individual parts of assemblies, poor operation of vibration damping systems and noise suppression systems, etc.) and other features. You may order aerodynamic testing of ventilation systems or get detailed information about the service by contacting our specialists.