...

Company ARTS, Atyrau

Installation of ventilation and air conditioning system for Head Office of Sberbank in Atyrau

ARTS renders the services not only to its clients involved in gas and oil production but also the banking sector. Our engineers have installed ventilation and air conditioning system for SB Sberbank JSC in Atyrau, located at the following address: Kulmanov Street, 119 A. The following works have been performed as the part of the … Read more

Maintenance of heating, ventilation, and air conditioning systems for Karabatan Utility Solutions LLP

ARTS completed its annual maintenance of heating, ventilation, and air conditioning (HVAC) systems at the gas turbine power plant, Karabatan site. The following types of equipment were serviced as part of the service: Water cooled chillers Duct fans, radial flow fans, smoke exhaust афты, axial roof fans, reversible fans Fan heaters Hydromodules Split systems HVAC … Read more

ARTS LLP wins in the National Competition “Qazaqstan Project Management Awards 2021”

Project Improvement Forum was held at the Academy of State Administration under the President of the Republic of Kazakhstan from December 3 to December 4. Outcomes of the II National Competition “Qazaqstan Project Management Awards 2021” were announced at the Forum. What Project Improvement Forum is conducted for? The professional competitive platform is organized in … Read more

Cold fog antiviral treatment

ARTS have been providing antiviral treatment to NCOC for one year. We provided our services to the following: Riverside, BC Frontier Plaza, Chagala Center, Chagala Medical Center, Data Center, Atyrau Training Center. The following scope of works has been completed: 1. Total area of ​​​​treated indoor premises was more than 1.6 million square meters in … Read more

Inspection of refrigeration supply systems at TCO facilities

Within the framework of the project “Inspection of refrigeration supply systems at CTL-1, CTL-2”, specialists of ARTS LLP conducted inspection of ventilation system and air conditioning systems at infrastructure objects of Complex Technological Lines, Tengiz plant. The purpose of the inspection was to determine the possibility of replacing obsolete refrigeration supply systems that ran on … Read more

Work at KPI (Kazakhstan Petrochemical Industries)

The area of ​​activity at this facility was the installation of copper pipes for the transportation of freon, for air conditioning and ventilation systems. Specialists of LLP “ARTS” carried out specific work requiring high qualifications, experience and skills. All work was done efficiently and on time.

Aerodynamic tests of ventilation systems for TCO CO

Specialists of ARTS have performed aerodynamic tests of ventilation systems for TCO’s Chief Office. Parameters of 33 ventilation branches from central shafts were measured floor by floor in the course of the works. The total number of test points was 2,230. Aerodynamic tests of ventilation systems included operational checks of air conditioning systems, ventilation systems, … Read more

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.